Site start

Building extension site start — Templeogue

Templeogue, Dublin

1 commencement notice · start date 29 May 2017 · planning reference given

Planning SD15A/0089 · Planning application · Council file · external

View full project timeline

Commencement notices
1
Latest start date
29 May 2017
Latest notice
Scale not stated
Planning reference
SD15A/0089
Location
Templeogue, Dublin

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Templeogue, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file South Dublin County Council planning record Application details, status and decision record for SD15A/0089. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Development of a 9.62m long extension to the 5m high hurling wall on the south eastern boundary, the removal of 9.62m x 15.2m of existing tarmac surfacing (with the loss of 4 car parking spaces), removal of the 15.2m x 9.57m tarmac ball wall surface adjacent the enclosed All-weather facility, re-surfacing of both these removed areas with synthetic all-weather grass, removal of a 10.1m section of internal 5m high all-weather fencing, erection of a 15.2m long section of internal 5m high all-weather fencing with lockable pedestrian gate securing the new 19.19m x 15.2m area of all-weather, associated ball-stop structure & netting to enclose the facility (to match existing), and all associated site works.

Work stated for this notice Scale not stated for this notice.
Planning reference SD15A/0089

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.