2 unique commencement events · latest notified commencement 16 Jan 2023 · planning basis not stated
- Unique commencement events
- 2
- Latest notified commencement
- 16 Jan 2023
- Latest notice
- 7,791 m²
- Planning references supplied
- None stated
- Public location
- Dublin, Dublin
Public source geography
Site location
- Public site / locality
- Dublin, Dublin
- County
- Dublin
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
The project consists of: (i) The refurbishment of an existing 5 no. storey building to provide for a new façade treatment to all elevations. (ii) The extension of the existing 5th storey set back level in line with the main façade along the northern elevation. (iii) The provision of 2 no. additional floors, set back from the north, east and west elevations. (iv) The provision of a café unit to the west side of the building fronting Georges Quay and Luke Street to the east at ground & mezzanine level (v) Amendments to the ground floor layout to provide for a new entrance lobby to the office to the east of the building. (vi) Amendments to basement level to provide for a reconfiguration of the car parking spaces, 80 no. cycle parking spaces, 3 no. motorbike spaces, new shower and locker rooms, staff amenities, bin store, managers office and plant room. The existing access to basement will remain unchanged. (vii) Alterations to the hard and soft landscaping, SUDs drainage provision of plant at basement and roof level, 2 no. terraces at 5th and 6th floor to the north, east and west, green roofs and all other associated site development works necessary to facilitate the development The proposed development is located on site of 0.14ha at Block B, Georges Quay, Dublin 2, . The site is bound by Georges Quay to the north, Georges Quay Plaza to the south, 1GQ to the east and Tara Street Station/Railway bridge to the west. Luke Street runs through the site in a north/south direction with the existing building bridging across Luke Street from 1st floor level. The enabling works for the proposed development involves the partial demolition of the building including all existing external facades. Note this work has commenced on site as per Commencement Notice reference number CN0090761DC The development is subject to Fire Safety Certificate Reg.Ref. No. FSC1221/22, and Disability Access Certificate Ref. DAC2201859DC. These certificates allow for a new commercial building w
Floor area stated for this source: 7,791 m².
Enabling & demolition works including erection of hoarding, removal of façade & soft trip of building interior
Floor area stated for this source: 5,220 m².