Site start
Building extension site start — Dublin
Dublin 1, Dublin
1 commencement notice · start date 02 May 2025 · planning reference given
Planning 4738/22 · Planning application
- Commencement notices
- 1
- Latest start date
- 02 May 2025
- Latest notice
- 30 m²
- Planning reference
- 4738/22
- Location
- 16 Denmark Street Great, Dublin 1
Location
Where the site is
- Area
- Dublin 1, Dublin
- County
- Dublin
Addresses on the notices
- 16 Denmark Street Great, Dublin 1
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
PROTECTED STRUCTURE: The development will consist of: 1. Internal works at ground floor comprising of: a) Strengthening /repair of original floor structure/timber joists; b) Installation of new electrical services; c) New demountable metal shop security screens to inside of shopfront complete with support framing; 2. Internal works at basement floor comprising of: a) Partial removal/reinstatement of original lath and plaster ceilings, insecticide treatment of timbers; b) Installation of damp proofing drainage sheet/sump to walls and floor with new finishes; c) Repair and part replacement of first (lower) stairs flight; d) Installation of new electrical services; 3. All associated conservation works, repairs, redecoration, drainage and ancillary works.
Floor area stated for this source: 30 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.