Site start
Building extension site start — Graigue
Graigue, Adare, Limerick
1 commencement notice · start date 12 Mar 2018 · planning reference given
Planning 17551 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 12 Mar 2018
- Latest notice
- 1 unit
- Planning reference
- 17551
- Location
- Graigue, Adare, Limerick
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 17551 Limerick City and County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Graigue, Adare, Limerick
- County
- Limerick
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Limerick City and County Council planning record Application details, status and decision record for 17551. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
(a) Demolition of single storey attached garage to side (south-west), (b) demolition of single storey utility returns to side (south-west) and rear, (c) demolition of first floor dormer to front, (d) demolition of one chimney stack, (e) construction of single storey porch enclosure extension to front, (f) construction of two storey pitched roof extension to side (south-west), (g) construction of single storey flat roof extension to rear, (h) construction of replacement mono-pitched roof dormer extension to front, (i) construction of flat roof dormer extension to rear, (j) replacement of existing roof with new roof to same pitch, eaves and ridge height, (k) alterations to window opes to front elevation comprising blocking up one window and widening one window, (l) new window to side (north-east) elevation at ground floor level, (m) internal alterations and remodelling throughout, (n) new on-site waste water treatment system and polishing filter and (o) all ancillary site works
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.