Sacred Heart Primary School — site start
Roscrea, Tipperary
1 commencement notice · start date 17 Mar 2016 · planning reference given
Planning 12/510350 · Council file · external
- Commencement notices
- 1
- Latest start date
- 17 Mar 2016
- Latest notice
- 1 unit
- Planning reference
- 12/510350
- Location
- Roscrea, Tipperary
Location
Where the site is
- Area
- Roscrea, Tipperary
- County
- Tipperary
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
(A). Phased Demolition of existing school and associated prefabricated temporary teaching accommodation units (C) Temporary relocation of existing prefabricated teaching unit for use by school during construction period (B). Construction of new part single storey and part two-storey school building including 12 No. Classrooms, 7 No. Special Education Tuition Rooms, Multi-purpose room, Library\ Resource Room, GP Room, associated stores and administrative offices. (C). Construction of on-site bus turning and set down area including car park, 2 No. ball courts, play areas and bin storage area. (D). Partial demolition of existing boundary wall to 'New Line' and construction of new re-aligned boundary wall, widening of existing site entrance to south west corner of site and widening of existing access road along west site boundary. (E). All ancillary associated site works, at Sacred Heart Primary School, Airhill, Parkmore, Roscrea, Co. Tipperary
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.