Site start
Building extension site start — Dublin
Dublin
1 commencement notice · start date 24 Sep 2024 · planning reference given
Planning 4074/23 · Planning application
- Commencement notices
- 1
- Latest start date
- 24 Sep 2024
- Latest notice
- 28 m²
- Planning reference
- 4074/23
- Location
- Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
Addresses on the notices
- roof level to side (West Elevation)
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of (a) - Demolition and safe removal of existing chimney stack and roof hip structure at roof level to side (West Elevation). (b) - The raising of existing gable wall and 1no. window with obscure glass at side (West Elevation) with modification / extension of existing roof structure. (c) - Construction of 1no. dormer at rear, including the conversion of existing attic space for domestic storage / ancillary accommodation, incorporating new access stairs and shower room, with 3no. windows and 1no. velux roof-light at rear (North Elevation) and 2no. velux roof-lights at front (South Elevation). (d) - The widening of existing vehicular entrance from 2.5 meters to 4.2 meters with a new permeable finish to front driveway, including all necessary site works to facilitate the development.
Floor area stated for this source: 28 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.