Commencement notice group
Commencement notices — Tallaght
Tallaght, Dublin
1 unique commencement event · latest notified commencement 18 Nov 2014 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 18 Nov 2014
- Latest notice
- Scale not stated
- Planning references supplied
- SD14A/0074
- Public location
- Tallaght, Dublin
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 0
- Open exact official planning record: SD14A/0074 South Dublin County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Tallaght, Dublin
- County
- Dublin
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file South Dublin County Council planning record Application details, status and decision record for SD14A/0074. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Unmanned Petrol Filling Station. 2 no. 4 hose pumps under a canopy dispensing petrol and diesel on each side of the pump; 2 no. 4 hose pumps under a canopy dispensing diesel and marked Gas Oil(MGO) on each side and one addditional two hose pump dispensing Diesel and Adblue; Three underground storage tanks, one 60,000lt tank split 50,000/10,000 lt storing Diesel and Marked Gas Oil, one 40,000Lt tank storing unleaded petrol and one 5,000Lt tank storing Adblue; all the associated fuel pipework between the pumps and underground tanks and fill points and vents;concrete slab surfacing and associated drainage; the drainage from the area around the forecourt and delivery points will be discharged into a 10,000Lt petrol interceptor prior to discharge to the proposed drainage system.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.