Site start
Site start — Naas
Naas, Kildare
1 commencement notice · start date 05 Aug 2025 · planning reference given
Planning 231027 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 05 Aug 2025
- Latest notice
- 4 m²
- Planning reference
- 231027
- Location
- Naas, Kildare
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 231027 Kildare County Council
Exact appeal 319831 · Grant permission with revised conditions · 2024-12-02 · Open official case
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Naas, Kildare
- County
- Kildare
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 231027. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The change of use from an adjacent agricultural field to a natural grass playing pitch with internal access from existing car park area, 6 no. 18m high lighting units, ball stop netting, pitch fencing, perimeter walking track, a ball wall and scoreboard. Also the upgrade of the existing lighting system on the existing natural grass pitch, to include 6 no. 18m high lighting units and all associated site works
Floor area stated for this source: 4 m².
Source unit value with scope not stated: 6 units. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.