Commencement notice group

Building extension commencement notices — Ballinamore

Ballinamore, Tipperary

1 unique commencement event · latest notified commencement 01 Jul 2024 · planning reference supplied

View full project timeline

Unique commencement events
1
Latest notified commencement
01 Jul 2024
Latest notice
1 unit
Planning references supplied
2361015
Public location
Ballinamore, Tipperary

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
1
Exact completion events
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Ballinamore, Tipperary
County
Tipperary

Notice location variants

  • Anner Castle, Ballinamore, Clonmel, Co Tipperary
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Tipperary County Council planning record Application details, status and decision record for 2361015. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

the fit-out of Anner Castle as a private residence following the completed fabric restoration in 2019 (Planning Ref:14/600555). This is to include the following: a- 8 bedrooms and associated bathrooms, b- Wheelchair accessible lift, c- Refurbishment and extension of the existing North Staircase d-The completion of the 2 number ancillary circulation staircases. e- New foul water treatment system. All with the associated site development works at Anner Castle, Ballinamore, Clonmel, Co Tipperary. A Protected Structure NIAH – 22207713 / Recorded Monument (No: TS077-089)

Work stated for this notice 1 unit Explicit phase quantity stated by the source.

Floor area stated for this source: 470 m².

Planning reference 2361015

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.