Site start

Building extension site start — Annacotty

Annacotty, Limerick

3 commencement notices · latest start date 17 Aug 2023 · planning references given

Planning 22462 · Planning application · Council file · external

View full project timeline

Commencement notices
3
Latest start date
17 Aug 2023
Latest notice
5 m²
Planning references
22/462 · 22462
Location
Annacotty, Limerick

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning 22462 — CONDITIONAL · Decision 2022-09-05 · Final grant 2022-10-11

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Annacotty, Limerick
County
Limerick

Addresses on the notices

  • Limerick
  • Plassey, Limerick
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Limerick City and County Council planning record Application details, status and decision record for 22/462. Official council planning portal Official link · last checked 29 Jul 2026 Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

J&J Visioncare Phase 7 CTO Project - TOC Enclosure - Install a Single Storey Metal Container to accommodate Plant & Equipment with Associated Site Development Works

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 5 m².

Planning reference 22/462
Notice 2 Commencement notice

Johnson & Johnson Vision Care (Ireland) - MVR Distillation Plant - Install of Double Stacked Metal Containers with Access Platform & Stairs on Concrete Base Slab with associated Site Development Works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 56 m².

Planning reference 22/462
Notice 3 Commencement notice (owner-supplied)

Amendments to previously approved (Plan ref 18/1263) development of an extension to the existing Manufacturing Building, with associated plant, equipment and ancillary works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 6,715 m².

Planning reference 22462 Developer stated: Johnson & Johnson Vision Care Ireland Unlimited Company

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.