Planning record · Co. Limerick
Johnson & Johnson Vision Care (Ireland), National Technology Park, Plassey Limerick
Granted 5 Sep 2022 (final grant issued 11 Oct 2022)
We no longer update this application, so we can't email you about it. Get new planning applications in National Technology Park by email
Key facts
- Planning application 22462 at Johnson & Johnson Vision Care (Ireland), National Technology Park, Plassey Limerick: Amendments to previously approved.
- It was received by Limerick City and County Council on 25 Apr 2022.
- Status: Granted 5 Sep 2022 (final grant issued 11 Oct 2022).
- Work was due to start on 26 Oct 2022, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Limerick City and County Council planning register, as last seen on 2 Jun 2026. Open the council's file
More planning applications in National Technology Park · Planning applications in Co. Limerick
Council register
The council's register shows: Granted on 5 Sep 2022.
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
Amendments to previously approved
amendments to previously approved (Plan red 18/1263) development of an extension to the existing Manufacturing Building, with associated plant, equipment and ancillary works. The amendments will comprise: (a) an increase in area from 5,005 m² to 6,599 m² of the approved extension to the main building comprising the construction of an extended production hall with mezzanine plant space overhead, and amendment to the approved predominantly 2 story (part 3 story) production support areas and utility block. (B) Increase in roof height of the extended production hall. The apex will increase form approved 22.30m OD to 23.85m OD. The western parapet will remain at the previously approved height (22.75m OD) to match the western parapet of the existing building. The southeastern and eastern parapets will step up from the approved 22.30m OD to 24.38m OD. Guardrails are proposed to provide edge safety protection to the roof areas where necessary. (C) Increase from one to two loading bays on the southeast elevation of the extension. (D) Addition of a single storey electrical room (15 m²), and a two-storey electrical/control room (140 m²) to the rear of the building. (E) Amendments to the approved layout of the new plant and equipment to the rear of the building, including the installation of additional tanks varying from circa 5.5m to circa 12.0m high, bunds, pipe racks, a new solvent recovery system with 2 no. columns circa 16m high, an additional15.0m high stack in a reconfigured abatement system. (F) 2 no. new cooling towers circa. 11.42m high in the existing utilities yard. (G) Omission of the previously approved additional solvent tanker loading bay in the utilities yard. (H) Relocation of the existing hydrogen peroxide unloading areas. (I) A new pipe rack across the existing services yard. (J) Amendment to size and location of the previously approved additional water retention pond along the southern boundary and associated site works. A Natura Impact Statement has been prepared in respect of this planning application
- Location
- National Technology Park, Co. Limerick Map
- Planning reference
- 22462
Numbers and dates
- Floor area
- 11,759 m²
- Project type
- Planning record
- Received
- 25 Apr 2022
- Decision to grant
- 5 Sep 2022
- Final grant
- 11 Oct 2022
- Site start notified
- 26 Oct 2022
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Site history
This site's history
-
Earlier permission 181263 for this site: granted 8 May 2019, commencement notice filed for a start on 14 Jun 2022.
(a) an extension to the main building comprising the construction of an extended production hall with mezzanine plant space overhead, a… Named in this application's description
Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 22462 on eplanning.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Limerick City and County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 26 Oct 2022Notice filed · phase 1 · Amendments to previously approved (Plan ref 18/1263) development of an extension to the...View the site start
- 13 Jun 2023Notice filed · phase 2 · Johnson & Johnson Vision Care (Ireland) - MVR Distillation Plant - Install of Double...View the site start
- 17 Aug 2023Notice filed · phase 3 · J&J Visioncare Phase 7 CTO Project - TOC Enclosure - Install a Single Storey Metal...View the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.