PlanningBrief · Supplier outreach brief

Housing commencement notices — Blessington Demesne

Blessington Demesne, Wicklow · Wicklow County Council

QR code for this project brief Scan to share this brief
Publication rank
1 of 10
Notice events
6
Latest commencement
08 Jun 2026
Largest stated units
185
Largest stated floor area
16539 m²

Scope boundary: These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion. This is a commencement notice group, not a canonical scheme. Each notice remains a separate event. Largest single notice-stated value in the reviewed group. Notice values are not summed and are not presented as whole-scheme scale.

Official planning material

Drawings index

Architecture drawings

Site layout and masterplan

Phasing plan

House-type plans

Engineering and drainage

Landscape plans

Visualisations

Event-level evidence

Commencement story

  • CN0148422WW 08 Sep 2026 · 8 units · Commencement notice

    Duplex Block D30 - Erection of a multi unit block with balconies, comprising 4no two storey timber framed 3 bed units over 4no two bed ground floor masonry construction apartments with surface car parking and associated site works– 1 building.

  • CN0144200WW 17 Jun 2026 · 24 units · Commencement notice

    Erection of a 5 storey structural frame multi unit block, with balconies,Block B32, 1-24 Ballycomyn Lodge, comprising of 24 apartment units over ground floor commercial use, surface parking and associated site works.

  • CN0143184WW 08 Jun 2026 · 8 units · Commencement notice (owner-supplied)

    Erection a Duplex Block D29 of 4 two storey timber frame duplex units over 4 ground floor traditional built apartments, with surface car parking, communal bike store and associated site works– 1 building.

  • CN0143138WW 05 Jun 2026 · 8 units · Commencement notice (owner-supplied)

    Erection of Duplex Block D26 consisting of 4 two storey timber frame duplex units over 4 ground floor traditional built apartments, with surface car parking, detached communal bike store and associated site works– 1 building.

  • CN0140156WW 30 Mar 2026 · 744 m² · Commencement notice (owner-supplied)

    Mixed Use Development of 197 one, two and three storey timber frame houses, 24 two storey timber frame duplex units over 24 ground floor traditional built apartments, across 6no three storey Blocks and the erection of a 5 storey structural frame, multi-unit block with balconies, comprising of 24 apartment units over ground floor retail space, with surface car parking, communal bin/bike stores and associated site works, including 2 new site entrances to be constructed in 4 phases – 204 buildings.

  • CN0139105WW 20 Feb 2026 · 744 m² · Commencement notice (owner-supplied)

    Mixed Use Development of 197 one, two and three storey timber frame houses, 24 two storey timber frame duplex units over 24 ground floor traditional built apartments, across 6no three storey Blocks and the erection of a 5 storey structural frame, multi-unit block with balconies, comprising of 24 apartment units over ground floor retail space, with surface car parking, communal bin/bike stores and associated site works, including 2 new site entrances to be constructed in 4 phases – 204 buildings.

  • CN0139102WW 20 Feb 2026 · 8 units · Commencement notice

    Mixed Use Development of 197 one, two and three storey timber frame houses, 24 two storey timber frame duplex units over 24 ground floor traditional built apartments, across 6no three storey Blocks and the erection of a 5 storey structural frame, multi-unit block with balconies, comprising of 24 apartment units over ground floor retail space, with surface car parking, communal bin/bike stores and associated site works, including 2 new site entrances to be constructed in 4 phases – 204 buildings.

  • CN0138567WW 05 Feb 2026 · 185 units · Commencement notice

    Mixed Use Development of 197 one, two and three storey timber frame houses, 24 two storey timber frame duplex units over 24 ground floor traditional built apartments, across 6no three storey Blocks and the erection of a 5 storey structural frame, multi-unit block with balconies, comprising of 24 apartment units over ground floor retail space, with surface car parking, communal bin/bike stores and associated site works, including 2 new site entrances to be constructed in 4 phases – 204 buildings.

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

PlanningBrief branding is neutral. No project organisation is presented as a customer, partner, endorser or appointed supplier.