Site start

Site start — Dublin

Dublin 15, Dublin

1 commencement notice · start date 12 May 2022 · planning reference given

Planning FW22A/0011 · Planning application

View full project timeline

Commencement notices
1
Latest start date
12 May 2022
Latest notice
706 m²
Planning reference
FW22A/0011
Location
Block 5, Blanchardstown Corporate Park, Dublin 15

Location

Where the site is

Area
Dublin 15, Dublin
County
Dublin

Addresses on the notices

  • Block 5, Blanchardstown Corporate Park, Dublin 15
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

The fit-out of an existing Data Centre located in Blanchardstown Corporate Park, Dublin 15 as part of Phase 2 works. Phase 1 works were commenced under a Short Form Commencement Notice (Ref No: ). Phase 2 comprises data hall fit out works to an area measuring 455 m2, with an IT load of 1.4 MW, plant in external compound, associated support service on gantry level and 2 no. standby generators with associated flues, server and plant rooms at ground floor and customer room on the first floor with and IT load of 50kw.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 706 m².

Planning reference FW22A/0011

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.