Site start
Site start — Dublin
Dublin 15, Dublin
1 commencement notice · start date 12 May 2022 · planning reference given
Planning FW22A/0011 · Planning application
- Commencement notices
- 1
- Latest start date
- 12 May 2022
- Latest notice
- 706 m²
- Planning reference
- FW22A/0011
- Location
- Block 5, Blanchardstown Corporate Park, Dublin 15
Location
Where the site is
- Area
- Dublin 15, Dublin
- County
- Dublin
Addresses on the notices
- Block 5, Blanchardstown Corporate Park, Dublin 15
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The fit-out of an existing Data Centre located in Blanchardstown Corporate Park, Dublin 15 as part of Phase 2 works. Phase 1 works were commenced under a Short Form Commencement Notice (Ref No: ). Phase 2 comprises data hall fit out works to an area measuring 455 m2, with an IT load of 1.4 MW, plant in external compound, associated support service on gantry level and 2 no. standby generators with associated flues, server and plant rooms at ground floor and customer room on the first floor with and IT load of 50kw.
Floor area stated for this source: 706 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.