Site start
Housing site start — Walkinstown
Walkinstown, Dublin
1 commencement notice · start date 27 Mar 2017 · planning reference given
Planning 3640/16
- Commencement notices
- 1
- Latest start date
- 27 Mar 2017
- Latest notice
- Scale not stated
- Planning reference
- 3640/16
- Location
- Walkinstown, Dublin
Location
Where the site is
- Area
- Walkinstown, Dublin
- County
- Dublin
Addresses on the notices
- ground floor level and an upper storey side extension at first floor level to the gable side
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a single-storey extension to the rear at ground floor level and an upper storey side extension at first floor level to the gable side. The proposed side extension at first floor level will extend to the existing front and rear elevations of the original house. A new pitched roof will be constructed on the front elevation over the existing single-storey element. The works will accommodate a new sitting room, bathroom and kitchen on the ground floor, with a new bedroom, wardrobe room and bathroom at first floor and all associated works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.