Commencement notice group
Commercial commencement notices — Headford
Headford, Galway
2 separate notices · latest notified commencement 03 Aug 2021 · planning reference supplied
- Source notices
- 2
- Latest notified commencement
- 03 Aug 2021
- Latest notice
- 1,226 m²
- Planning references supplied
- 18/1109
- Public location
- Headford, Galway
Public source geography
Site location
- Public site / locality
- Headford, Galway
- County
- Galway
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
The exact official planning file is available below.
-
Official planning file Application details, decision and available documents Galway County Council · reference 18/1109 Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Re-development of OPW Offices, Headford, Co. Galway: The development will consist of the demolition of 2 no. existing single/two storey office buildings located to the South of the site. The construction of a new two storey L-Shaped office block located on the site of the demolished buildings fronting onto St. Georges Sq. In addition, works will include alteration, upgrading and refurbishment of the existing rear office block located to the South-West of the site which will be connected to the new office building. External works will include hard and soft landscaping, new car-parking facilities and bicycle stands, new steps and ramps to moderate rising ground levels existing on site, new hard landscaping along the boundary with St. George’s Square, new gate and railings and reduced boundary wall to the laneway to the South, reoriented entrance gateway with signage on adjacent wall, replacement of boundary wall to the South-West with a retaining wall within the boundary, signage to front porch, new foul and surface drainage systems and all associated ancillary site works.
1,226 m² · stated on this notice
Phase 1 of 3 (Enabling / Mobilisation Works) - Demolition of Existing Hut & part of the Boundary wall, Re – Routing / Diversion of Existing Utilities, Construction of E.S.B. Substation, Forming 2 No. New Access Gates & installation of Temporary Accomodation Portacabins.
38 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.