Site start

Site start — Dublin

Dublin 7, Dublin

1 commencement notice · start date 26 Sep 2022 · planning reference given

Planning 3756/20 · Planning application

View full project timeline

Commencement notices
1
Latest start date
26 Sep 2022
Latest notice
500 m²
Planning reference
3756/20
Location
SPADE CLG King Street North, Dublin 7

Location

Where the site is

Area
Dublin 7, Dublin
County
Dublin

Addresses on the notices

  • SPADE CLG King Street North, Dublin 7
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

The development will comprise the construction of a 500m2 detached two storey building generally within the footprint of the former school building and playground (demolished after fire damage in 1992) to include a shared incubator community based kitchen with hospitality, tuition space, demonstration kitchen together with ancillary food preparation and storage, toilet and changing facilities within the building. Reconfiguration to the existing car park to the rear of the former St. Paul's Church will reduce the no. of parking spaces to the rear to 18 along with a delivery drop off and collection zone. 10 additional cycle spaces shall be provided. The two-storey building will include rooftop machinery and plant, photovoltaic panels and rooflights located behind the parapet wall at roof level. The grounds of the former graveyard to the west of the building shall be landscaped and planted with raised flower beds with a grass boarder, bench seating and a memorial plaque placed on the southern boundary wall. Connections are required to existing drainage, foul water, potable water, and utility services located to the north of the building. No works or alterations are proposed to the former St. Paul's Church which is a Recorded Monument (DU) and Protected Structure and lies within a zone of Archaeological Interest.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 500 m².

Planning reference 3756/20

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.