Commencement

Commercial new build, Belview Port, Kilkenny - Planning Application 2460103

Kilkenny / Belview Port / Belview Port, Kilkenny

Est. value €30m+
Units Not listed
Floor area 22,400 m²
Commenced 17 Sep 2025

Source-linked planning record

Commercial new build, Belview Port, Kilkenny - Planning Application 2460103

Kilkenny / Belview Port / Belview Port, Kilkenny
PB ref
PB-298293
Plan ref
2460103
Authority
Kilkenny County Council
Stage / date
Commencement / 17 Sep 2025
Est. value band
€30m+
Units / floor
22,400 m²
Project class
Commercial new build
Promoter
Castle Gypsum Ltd
Architect / agent
Castle Gypsum Ltd

Source: http://www.eplanning.ie/KilkennyCC/AppFileRefDetails/2460103/0

Key facts

Lead summary

Source
Owner-supplied commencement export
Planning authority
Kilkenny County Council
Application reference
2460103
Applicant
Castle Gypsum Ltd
Agent
Castle Gypsum Ltd
Decision stage
Commencement
Commenced
17 Sep 2025
Floor area
22,400 m²
Builder / developer
Castle Gypsum Ltd

Official description

Verbatim source text

for development on lands with a site area of approximately 11.57ha located at Gorteens, Co. Kilkenny. The development will consist of the construction of an integrated plasterboard manufacturing facility, incorporating a production plant with access from the industrial area road infrastructure at Gorteens, Co. Kilkenny. The production facility will have a floor area of 22,400 sq.m, with a height over finished ground level ranging from 19metres to 29metres. Roof mounted solar panels are proposed. The proposed development includes all site development works, landscaping, boundary treatments including earthworks, road works, retaining walls, vehicle entrance, vehicle parking with charging (HGV, cars and bicycles/scooters), gates, fencing, paving, water storage tanks, drainage and lighting. Planted berms are proposed within and along the perimeters of the development site. The development will include for extraction of groundwater for production process purposes. Servicing arrangements include the provision of a constructed surface water attenuation area. Access to connect to the public foul network and to mains water supply is proposed. The application will be accompanied by an Environmental Impact Assessment Report (EIAR) and by a Natura Impact Statement (NIS).

Verify against official source

Project team

Named source parties

Promoter
Castle Gypsum Ltd
Planning agent
Castle Gypsum Ltd
Builder / developer
Castle Gypsum Ltd

Lifecycle timeline

Application to site progress

  1. Applied

    1 Mar 2024 2460103
  2. Decision

    Conditional 12 Feb 2025
  3. Appeal

    Grant permission with conditions 321962 / 1 Aug 2025
  4. Commenced

    17 Sep 2025 Work started · Phase 1 Site Enabling, Earthworks, Site Investigation (Sept- Dec 2025), no building...
  5. Completed

    Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.