Site start

Housing site start — Thurles

Thurles, Tipperary

1 commencement notice · start date 12 Mar 2019 · planning reference given

Planning 18600189 · Planning application · Council file · external

View full project timeline

Commencement notices
1
Latest start date
12 Mar 2019
Latest notice
716 m²
Planning reference
18600189
Location
Thurles, Tipperary

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
1
  1. Completion certificate recorded — source scope not stated Tipperary County Council · commencement notice Completion certificate · First observed in the official monthly source 2019-03 7 units stated for this certificate · One certificate representation

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Thurles, Tipperary
County
Tipperary
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Tipperary County Council planning record Application details, status and decision record for 18600189. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

To Construct 6 no two storey semi- detached dwelling houses and 1 no single storey detached dwelling house with connection to existing services and all associated site development works (previously granted under Ref Nos PL50/2023 and 09540016

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 716 m².

Source unit value with scope not stated: 7 houses. It is not presented as notice-specific scale.

Planning reference 18600189 Developer stated: Peppard Investments Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.