Commencement notice group
Housing commencement notices — Tulla
Tulla, Clare
1 unique commencement event · latest notified commencement 14 Oct 2020 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 14 Oct 2020
- Latest notice
- 25 units
- Planning references supplied
- 198017
- Public location
- Tulla, Clare
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Tulla, Clare
- County
- Clare
Notice location variants
- Doonaun, Tulla, Co CN0069255CE
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Clare County Council planning record Application details, status and decision record for 198017. Official council planning portal Verified official link Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
A new housing estate development at Doonaun, Tulla, Co.Clare consisting of: a) 25 no. residential units comprising of: • 1 no. 4-bedroom house, single-storey, semi-detached, i.e. Type A • 1 no. 4-bedroom houses two-storey, semi-detached, i.e. Type B. • 6 no. 3 bedroom house, two-storey, semi- detached, i.e. Type C. • 6 no. 3 bedroom house, two-storey, semi- detached, i.e. Type D. • 8 no. 2-bedroom apartments, two-storey, semi-detached i.e. Type E. • 3 no. 3-bedroom house, single-storey semi-detached/detached, i.e. Type F. b) 34 ancillary car parking spaces within the development. c) The construction of pedestrian access point to the site. d) New vehicular access point to the site. e) Pedestrian link to the adjoining O’Reilly Park housing estate. f) On-site sewage pumping station with rising main connection to main sewer. g) Alterations to ground levels to accommodate the development. h) Surface water management will include attenuation and discharge to surface water network. i) All ancillary site works to include boundary and landscaping works
Floor area stated for this source: 2,084 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.