Commencement notice group
Housing commencement notices — Castlebar
Castlebar, Mayo
1 separate notice · latest notified commencement 19 Nov 2025 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 19 Nov 2025
- Latest notice
- 1,027 m²
- Planning references supplied
- P23/60041
- Public location
- Castlebar, Mayo
Public source geography
Site location
- Public site / locality
- Castlebar, Mayo
- County
- Mayo
Public site labels seen across the notices
- ground and first floor levels
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
1. New Build Extension Extension consisting of a 2-storey accommodation block containing 4no. general classrooms; a construction studies room; a machine and prep room; a home economics room; a textile room; toilets; lockers; stairs and circulation including a new link corridor (to the existing school 1999 extension) at ground and first floor levels. Demolition works corridor facilitated by demolition of the existing stairs at the end of the existing school corridors to allow for the new link, including accommodating works to the existing roof to integrate with the proposed roof of the link corridor. Upgrade works to the existing school lift. 2. Works to Existing Buildings Demolitions to Existing: • demolition of existing corridor end stairs; creation of openings in external wall; amendments to the existing roof and floors at the link tie in. Demolition of the boiler house and yard. Alterations and Upgrades: • Replacing the main school entrance doors and cross corridor doors plus minor upgrade works to the existing lift and wayfinding signage required for compliance with Building Regulations and statutory requirements. • Upgrade Mechanical & Electrical works including modifying existing ESB Supply and modifying the existing boiler and heat plant to accommodate the new extension. 3. Site Works and Services • New service road and pedestrian path to access and tie in with existing rear service yard • All associated site works including the diversion of storm water; diversion of existing foul sewer pump chamber; civil and structural works including boundary and site retaining walls and grading ground to account for existing ground conditions and levels • New line marking to existing parking areas to provide 2 No accessible parking spaces and set down area; new covered bicycle parking, 2 No. EV charging spaces, 14 standard parking spaces. • New external steps to work with the existing sloped topography; new under croft shelter space below section of proposed extension gro
1,027 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.