Site start
Site start — Laughanstown
Laughanstown, Dublin
1 commencement notice · start date 05 Mar 2019 · planning reference given
Planning DZ16A/0597 · Planning application
- Commencement notices
- 1
- Latest start date
- 05 Mar 2019
- Latest notice
- 97 m²
- Planning reference
- DZ16A/0597
- Location
- Laughanstown, Dublin
Location
Where the site is
- Area
- Laughanstown, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of gas infrastructure. The development will consist of the construction of an above ground installation (AGI) facility, for the operation and maintenance of gas pipeline. The facility includes 2 no. structures - a regulator skid (48.75 sqm, maximum height of 3.2 metres) and a boiler/instrumentation kiosk (48.1 sqm, maximum height of 3.9 metres); associated underground pipework; 2 no. 9m high floodlights and 2.4 metre high security fencing. A new access route from the existing Lehaunstown Lane/M50 overbridge (total length c.601 metres), landscaping and all associated site and development works.
Floor area stated for this source: 97 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.