Commencement notice group

Housing commencement notices — Rush

Rush, Dublin

1 unique commencement event · latest notified commencement 04 Aug 2025 · planning reference supplied

Unique commencement events
1
Latest notified commencement
04 Aug 2025
Latest notice
1 house
Planning references supplied
F25A/0098
Public location
Rush, Dublin

Planning-anchored public geography

Site identity and location

Canonical public locality
Rush, Dublin
County
Dublin

Notice location variants

  • the South Shore Road side, to the south of the site CN0131851FL
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0131851FL BCMS open-data feed

The development will consist to: A new vehicular access at the South Shore Road side, to the south of the site. Alterations to the above recently purchased dwelling to include; (i) revisions to the west elevation, including the demolition of the existing entrance porch, (ii) new patio doors and revised fenestration arrangements, to achieve passive solar gain, at the south elevation, (iii) the demolition of the existing mass concrete garage/shed on the north elevation, (iv) internal floor area alterations/upgrades, (v) the re-roofing of the entire roofed area with natural slate and include a new hipped roof arrangement at the rear.

Work stated for this notice 1 house Explicit phase quantity stated by the source.

Floor area stated for this source: 102 m².

Planning reference F25A/0098

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.