Site start

Montessori school — site start

Naas, Kildare

1 commencement notice · start date 18 Apr 2018 · planning reference given

Planning 16363 · Council file · external

Commencement notices
1
Latest start date
18 Apr 2018
Latest notice
1 unit
Planning reference
16363
Location
Naas, Kildare

Location

Where the site is

Area
Naas, Kildare
County
Kildare
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Alterations and modifications to an existing detached dormer bungalow to include the following: 1. Provision of external insulation and change of finish from existing brick façade on the front elevation (North) to render. 2. Elevational amendments including a) repositioning of existing windows/entrance door and replacement of the existing bay window on the front elevation (North), b) new window in lieu of existing side door and removal of two existing windows on the Eastern side elevation, c) repositioning of back door, removal of two existing windows and new sliding door in lieu of existing window on the rear elevation (South), d) new window in lieu of existing sliding door on the Western side elevation. 3. New rain canopy above entrance door. 4. Internal alterations to reintegrate the portion of the dwelling previously used as a Montessori school.

Work stated for this notice 1 unit Explicit phase quantity stated by the source.

Floor area stated for this source: 185 m².

Planning reference 16363

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.