Site start
Site start — St. James's St.
Dublin 8, Dublin
7 commencement notices · latest start date 31 Jan 2019 · planning reference given
Planning PARTX/0017 (29S.PA0043)
- Commencement notices
- 7
- Latest start date
- 31 Jan 2019
- Latest notice
- 163,454 m²
- Planning reference
- PARTX/0017
- Location
- Dublin 8, Dublin
Location
Where the site is
- Area
- Dublin 8, Dublin
- County
- Dublin
Addresses on the notices
- Dublin
- St. James's St., Dublin
- James's Street, Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Phase B of New Children's Hospital. All works associated with completion of construction of the New Children's Hospital building as per attached Documents. Excludes all works covered by previous Commencement Notices for earlier works associated with New Children's Hospital.
Floor area stated for this source: 163,454 m².
Architectural and Fire seal Fit-out works associated with the construction of underground Utility Tunnel. Note - Construction of the Tunnel structure has already been captured under an earlier Commencement Notice, ref 8391540. These Fit-out works are now being addressed separately, due to a staged procurement of the works across two separate contracts with separate appointment dates and construction teams. Please refer to attached drawings and PIP for guidance on limited scope of works involved.
Floor area stated for this source: 500 m².
NCH Phase A Main Contract Works comprising structural frame and associated works. Scope as per attached drawings.
Floor area stated for this source: 41,188 m².
Commencement of advance Phase A Main Contract works comprising piling, earthworks, Drimnagh Sewer and Main Drainage works, and MEP fit out works to the new Utility Tunnel.
The construction of a new Utility Tunnel involving excavation, construction of a linear concrete enclosure below ground level and waterproofing and backfilling to same.
The Construction of a new prefabricated medical air container room to St. James's Hospital Energy Centre.
Demolitions, Hoardings, service diversions and ancillary preparatory works for New Children's Hospital.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.