Site start
Housing site start — Clonmel
Clonmel, Tipperary
2 commencement notices · latest start date 24 Dec 2024 · planning references given
Planning ABP-311290-21 & ABP-320189-24 (TCC Ref.No. 2460316)
- Commencement notices
- 2
- Latest start date
- 24 Dec 2024
- Latest notice
- 1,694 m²
- Planning references
- 2460316 · ABP-311290-21 · ABP-320189-24
- Location
- Clonmel, Tipperary
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 2460316 Tipperary County Council
Exact appeal 320189 · Pending / not decided · 2024-10-31 · Open official case
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Reviewed planning, commencement and document evidence
Exact reviewed project dossier for ABP-311290-21, ABP-320189-24 (TCC Ref.No. 2460316), ABP-311290-21, ABP-320189-24 (TCC Ref.No. 2460316) under Tipperary County Council, retaining 2 separate commencement identities.
- Commencement identities
- 2 retained separately
- Latest group date
- 2024-12-24 not assigned across events
- Maximum on one notice
- 24 units never summed
- Reviewed index
- 3 3 exact document links
Planning and appeal references
- Appeal ABP-311290-21 Open exact official record
- Appeal ABP-320189-24 (TCC Ref.No. 2460316) Exact dated record link unavailable in this reviewed source
- Appeal ABP-311290-21 Open exact official record
- Appeal ABP-320189-24 (TCC Ref.No. 2460316) Exact dated record link unavailable in this reviewed source
Every retained commencement event
- 2024-12-24 Commencement notice 24 units on this event · 2805 m² on this event
- 2024-12-24 Commencement notice Official public source URL unavailable in the reviewed projection
Exact organisation roles
- Tipperary County CouncilPlanningauthority · Authority retained with the exact reviewed planning identity.
- An Coimisiún PleanálaAppealauthority · Exact appeal identity retained in the reviewed evidence.
Explicit facts with official citations
Each statement keeps its exact reference, official title or drawing-title locator, and review state.
- Appealcase Exact official case identity ABP-311290-21 is indexed for this dossier. ABP-311290-21 · Tipperary County Council planning record · Tipperary County Council planning record · reviewedexactdestination Open official evidence
- Appealcase Exact official case identity ABP-311290-21 is indexed for this dossier. ABP-311290-21 · Tipperary County Council planning record · Tipperary County Council planning record · reviewedexactdestination Open official evidence
- Commencementevent Official commencement notice dated 2024-12-24 is retained as a separate event. Building Control commencement notice · Exact notice reference · reviewedsupported
- Dwellingmix Notice states 24 units for that event; it is not summed with other notices. Building Control commencement notice · Exact notice reference · reviewedsupported
- Floorarea Notice states 2805 m2 for that event; it is not treated as project total. Building Control commencement notice · Exact notice reference · reviewedsupported
- Otherdrawing The exact official file index lists "Tipperary County Council planning record". ABP-311290-21 · Tipperary County Council planning record · Tipperary County Council planning record · reviewedexactdestination Open official evidence
- Decisionorder The exact official file index lists "Appeal decision and documents". ABP-311290-21 · Appeal decision and documents · Appeal decision and documents · reviewedexactdestination Open official evidence
- Decisionorder The exact official file index lists "Appeal decision and documents". ABP-311290-21 · Appeal decision and documents · Appeal decision and documents · reviewedexactdestination Open official evidence
Official document index highlights
Reviewed exact official destinations and explicit index titles; this is not asserted to be the complete authority file.
- Other official drawing Tipperary County Council planning record Open official evidence
- Decision or order Appeal decision and documents Open official evidence
- Decision or order Appeal decision and documents Open official evidence
Location
Where the site is
- Area
- Clonmel, Tipperary
- County
- Tipperary
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Tipperary County Council planning record Application details, status and decision record for 2460316. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-311290-21. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-320189-24. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of Phase 3 of residential development with 14 No. Units (Units 39-42 inclusive and Units 55-64 inclusive) comprising 14No. 3-Bedroom terraced houses; along with all associated site development works & services.
Floor area stated for this source: 1,694 m².
Source unit value with scope not stated: 38 houses. It is not presented as notice-specific scale.
Construction of Phase 4 of residential development with 24 No. Units (Units 65-88 inclusive) comprising 15No. 3-Bedroom terraced houses & 9No. 2-Bedroom terraced houses; along with all associated site development works & services.
Floor area stated for this source: 2,805 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.