Site start

Cherrywood Town Centre — site start

Dublin 18, Dublin

5 commencement notices · latest start date 26 Jan 2024 · planning reference given

Planning DZ17A/0862 · Planning application

View full project timeline

Commencement notices
5
Latest start date
26 Jan 2024
Latest notice
14,536 m²
Planning reference
DZ17A/0862
Location
Dublin 18, Dublin

Location

Where the site is

Area
Dublin 18, Dublin
County
Dublin

Addresses on the notices

  • Cherrywood Town Centre, TC1, Cherrywood, Dublin 22
  • Dublin
  • TC1 Cherrywood, Dublin 18
  • Cherrywood, TC 1 bounder by Grand Parade, Cherrywood Ave, Bishop Street, Cherrywood, Dublin 18
  • Cherrywood, Dublin
  • TC1 Cherrywood
  • Cherrywood, Dublin 18
Location evidence needs care
  • Notice source points are up to 111.6 km apart, so no combined representative point is shown.

Source positions remain separate:

  • Public notice source · 52.244900, -6.147200 Open point
  • Public notice source · 53.243730, -6.187584 Open point
  • Public notice source · 53.243730, -6.187584 Open point
  • Public notice source · 53.243152, -6.143295 Open point
  • Public notice source · 53.248947, -6.133725 Open point

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

Fit out of the Cherrywood TC 1 amenities area of the TC1 development of the scheme which consists of three residential blocks (A1, A2 & A3) situated over two shared basement levels at Cherrywood Town Centre, TC1, Cherrywood, Dublin 22.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 14,536 m².

Planning reference DZ17A/0862
Notice 2 Commencement notice

Commencement of site enabling works including installation of temporary pumps and on-site treatment filtration system to allow for construction of the 3 mixed use block over 2 levels of basement at TC1 Cherrywood, Dublin 18.

Work stated for this notice 1 unit Explicit phase quantity stated by the source.

Floor area stated for this source: 32,076 m².

Planning reference DZ17A/0862
Notice 3 Commencement notice

Soil excavation and site clearance at Cherrywood, TC 1 bounder by Grand Parade, Cherrywood Ave, Bishop Street, Cherrywood, Dublin 18.

Work stated for this notice 1 unit Explicit phase quantity stated by the source.

Floor area stated for this source: 32,076 m².

Planning reference DZ17A/0862
Notice 4 Commencement notice (owner-supplied)

Construction of a new Loop Access Ramp Structure serving the basement car park at TC1 Cherrywood. This commencement relates to the structure of the ramp only. The remainder of the works to the ramp will be undertaken and certified as part of the construction of the basement to be commenced under separate notice.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 1,943 m².

Planning reference DZ17A/0862 Developer stated: Its Sub- Fund HCDF Retail Fund
Notice 5 Commencement notice

The construction of two new residential buildings of 5 to 8 storeys (Blocks F1 and F3), containing 308 apartments, associated common areas and communal facilities, retail units and ancillary accommodation. Landscaping works to include public realm works, the construction of a new street, and the construction of a shared courtyard. The construction of a double level basement which includes accommodation directly associated with Blocks F1 and F3 at Cherrywood, Dublin 18

Work stated for this notice 308 units Explicit phase quantity stated by the source.

Floor area stated for this source: 57,970 m².

Planning reference DZ17A/0862

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.