Commencement notice group

Commercial commencement notices — Carrick-on-Suir

Carrick-on-Suir, Tipperary

1 separate notice · latest notified commencement 16 Dec 2024 · planning reference supplied

Source notices
1
Latest notified commencement
16 Dec 2024
Latest notice
231 m²
Planning references supplied
P8/22/03
Public location
Carrick-on-Suir, Tipperary

Public source geography

Site location

Public site / locality
Carrick-on-Suir, Tipperary
County
Tipperary

Public site labels seen across the notices

  • ground and first floor and will incorporate a new lift within the existing building footprint
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

Planning referenceP8/22/03

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0123284TT BCMS owner-supplied export

The proposed development consists of a change of use from a Post Office (former / disused) to a Digital Working Hub incorporating single and shared offices with associated works, conservation repair of existing building fabric. The works will include minor adjustments to the existing plan layout at ground and first floor and will incorporate a new lift within the existing building footprint.

231 m² · stated on this notice

Planning reference P8/22/03 Builder stated: Marlhill Construction Services Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.