Commencement notice group
Housing commencement notices — Newtowngore
Newtowngore, Leitrim
1 unique commencement event · latest notified commencement 02 Apr 2021 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 02 Apr 2021
- Latest notice
- 1 house
- Planning references supplied
- None stated
- Public location
- Newtowngore, Leitrim
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 0
- Open exact official planning record: 2052 Leitrim County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Newtowngore, Leitrim
- County
- Leitrim
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Leitrim County Council planning record Application details, status and decision record for 2052. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
(a) removal of 2 no. partially constructed two storey four bedroom type dwelling houses which are constructed to finished floor level on Site no. 3 & Site no. 4 and which were originally granted full planning permission under Planning Ref. No. P.06/322 as part of a residential development of 4 no. 2 storey 4 bedroom type dwelling houses ; (b) redesign of previously permitted access road and green area granted full planning permission under Planning Ref. No. P.06/322 so as to suit revised site boundaries together with the construction of 3 no. 2 storey 3 bedroom detached type dwelling houses on approximately the same sites described in (A) above, i.e. on site No. 3 & Site No. 4 and therefore resulting in a residential development of 5 no. 2 storey dwelling houses in the event of a successful grant of permission, i.e. 2 no. 4 bedroom 2 storey type dwelling houses and 3 no. 3 bedroom 2 storey detached type dwelling houses;(c) Proposed connection into the existing foul sewer, surface water and water main networks servicing the previously permitted residential development under Planning Ref. No. P.06/322 so as to service the proposed 3 no. 2 storey 3 bedroom detached type dwelling houses, and all ancillary works in lieu of PERMISSION for (a) removal of 2 no. partially constructed 2 storey 4 bedroom type dwelling houses which are constructed to finished floor level on Site no. 3 & Site no. 4 and which were originally granted full planning permission under Planning Ref. No. P.06/322 as part of a residential development of 4 no. 2 storey 4 bedroom type dwelling houses; (b) redesign of previously permitted access road and green area granted full planning permission under Planning Ref. No. P.06/322 so as to suit revised site boundaries together with the construction of 4 no. 2 storey 3 bedroom semi-detached type dwelling houses on approximately the same sites described in (A) above, i.e. on site No. 3 & Site No. 4 and therefore resulting in a residential development of 6 no.
Floor area stated for this source: 894 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.