Site start

Building extension site start — Dublin

Dublin

1 commencement notice · start date 04 Apr 2023 · planning reference given

Planning 2860/21 · Planning application · Council file · external

View full project timeline

Commencement notices
1
Latest start date
04 Apr 2023
Latest notice
20,933 m²
Planning reference
2860/21
Location
Dublin

Location

Where the site is

Area
Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

Proposed redevelopment of The Treasury Building consisting of the extension and refurbishment of the existing 6 storey building to result in an 8-storey building over part basement (at The Treasury Building, Grand Canal Street Lower, Dublin 2) The commenced works consist of Shell & Core works only as outlined below and as reflected on the accompanying design drawings. • Extension and refurbishment of the existing six storey building to result in an eight storey building over part basement (including mezzanine floor levels at ground and first floor levels) with a winter garden/lift lobby, atrium, plant room and screen at roof level • Demolition of existing atrium and construction of a new atrium on the Eastern elevation • Amendments to and replacement of the existing façade detail on all other elevations • Addition of two floor levels, setback from the Southern façade at sixth and seventh floor levels (a setback is also proposed from the new roof top plant screen on all elevations providing for a roof terrace and garden including a ‘walking path’) • Provision of an accessible terrace at the sixth floor level fronting the North elevation • Provision of 209 external bicycle spaces, changing and showering facilities at ground floor mezzanine level • Reconfiguration of existing car park area to remove thirteen car parking spaces providing for two disabled carparking spaces and a new loading bay and waste management area at the rear of the building • Extension of the existing stair cores to serve the additional proposed levels and roof terrace • Introduction of solar panels at roof level It is proposed to complete and certify the entire building in terms of Shell & Core. A subsequent CN will be lodged in the future for the fit-out works within the office floor-plates on each floor (grey-box areas). • It is intended to complete and certify the proposed works in one Phase. • Sanitary facilities being provided as part of the Shell & Core works will be completed and certified

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 20,933 m².

Planning reference 2860/21

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.