Planning record · Co. Dublin
The Treasury Building, Grand Canal Street Lower, Dublin 2 D02XN96
Granted 27 Jan 2022 (final grant issued 10 Mar 2022)
We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 2 by email
Key facts
- Planning application 2860/21 at The Treasury Building, Grand Canal Street Lower, Dublin 2 D02XN96: Extension and refurbishment of the existing 6 storey building…
- The applicant is Google Ireland Ltd. The agent is Meadhbh Nolan.
- It was received by Dublin City Council on 1 Jun 2021.
- Status: Granted 27 Jan 2022 (final grant issued 10 Mar 2022).
- Work was due to start on 4 Apr 2023, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Dublin City Council planning register, as last seen on 13 Oct 2026. Open the council's file
More planning applications in Dublin 2 · Planning applications in Co. Dublin
Council register
The council's register shows: Granted on 27 Jan 2022.
Application details as we last saw them in the national register on 13 Oct 2026.
What and where
Extension and refurbishment of the existing 6 storey building…
We, Google Ireland Limited, intend to apply for planning permission for development comprising the refurbishment and extension of the existing 'Treasury Building' to provide c. 7,802 m² of additional office floor space [resulting in a total of 20,933 m² GFA] on the c. 0.40ha site at Grand Canal Street Lower, Dublin 2 D02XN96. The proposed development will consist of: • Extension and refurbishment of the existing 6 storey building to result in an 8 storey building over part basement (including mezzanine floor levels at ground and first floor levels) with a winter garden/lift lobby, atrium, plant room and screen at roof level; • Demolition of existing atrium and construction of a new atrium on the eastern elevation; • Amendments to and replacement of the existing façade detail on all other elevations; • Addition of 2 no. additional floor levels, setback from the brick (southern) façade at 6th and 7th floor levels [a setback is also proposed from the new roof top plant screen on all elevations providing for a roof terrace and garden including a 'walking path']; • Provision of an accessible terrace at the 6th floor level fronting the north elevation; • Provision of 209 no. bicycle spaces, changing and showering facilities at ground floor level; • Reconfiguration of existing car park area to remove 13 no. car parking spaces providing for 2 no. disabled car parking spaces and a new loading bay and waste management area at the rear of the building; • Extension of the existing stair core (northern and western elevations) to serve the additional proposed levels and roof terrace; • 300 m² of solar panels at roof level; • Hard and soft landscaping including at roof level, removal of existing loading bay on Grand Canal Street Lower and all associated site development works necessary to facilitate the development.
- Location
- Dublin 2, Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- 2860/21
- Application type
- Permission
- Applicant
- Google Ireland Ltd
- Agent
- Meadhbh Nolan
Numbers and dates
- Floor area
- 29,035 m²
- Project type
- Planning record
- Received
- 1 Jun 2021
- Decision to grant
- 27 Jan 2022
- Final grant
- 10 Mar 2022
- Site start notified
- 4 Apr 2023
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2860/21 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Dublin City Council planning register, as last seen on 13 Oct 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 4 Apr 2023Notice filed · Proposed redevelopment of The Treasury Building consisting of the extension and...View the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.