Site start
Thomas Court — site start
Clonmel, Tipperary
3 commencement notices · latest start date 24 Apr 2024 · planning references given
Planning 20/283 PL92.308934
- Commencement notices
- 3
- Latest start date
- 24 Apr 2024
- Latest notice
- 3,751 m²
- Planning references
- 20/283 · PL92.308934
- Location
- Clonmel, Tipperary
Location
Where the site is
- Area
- Clonmel, Tipperary
- County
- Tipperary
Addresses on the notices
- Thomas Court, Thomas St
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for PL92.308934. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of 41 no. dwelling houses (no. 1-41) at Thomas Court, Thomas St., Clonmel, Co. Tipperary
Floor area stated for this source: 3,751 m².
Source unit value with scope not stated: 41 houses. It is not presented as notice-specific scale.
Construction of three storey building for 12 no. apartments (no.’s 50-61) at Thomas Court, Thomas St., Clonmel, Co. Tipperary
Floor area stated for this source: 910 m².
Construction of three storey building for 8 no. apartments (no.’s 42-49) at Thomas Court, Thomas St., Clonmel, Co. Tipperary
Floor area stated for this source: 617 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.