Site start
Housing site start — Raheny
Raheny, Dublin
1 commencement notice · start date 15 Jun 2022 · planning reference given
Planning 3796/21 · Planning application
- Commencement notices
- 1
- Latest start date
- 15 Jun 2022
- Latest notice
- 1 house
- Planning reference
- 3796/21
- Location
- Raheny, Dublin
Location
Where the site is
- Area
- Raheny, Dublin
- County
- Dublin
Addresses on the notices
- front of house
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
I have Full P.P. Ref 3796/21 Dated 12/1/22 for bedroom extension in dormer bungalow and replacing existing Garage Doors which was part of the original house building in 1962 and fitting a window in place of Garage Doors at front of house. The Garage was converted by previous owners to a kitchen/utility room and is Historic and all my neighbours have done the same over 25 years ago. I also included in Plans to replace windows to rear of house Dining room to Patio Doors but will not be not be doing those changes at present. I simply want to remove garage doors, build up blockwork to fit a new window in Garage/utility/kitchen room. However due to lack of cash with high prices and lack of builders in current housing economic crisis I can only replace garage doors with window for security, insulation and to keep mice and rats from entering my home. I'm not proceeding with the bedroom for the time being. I have engaged McMahon & Nagle to replace all windows and Garage windows and the date of installation is at the end of July 2022.
Floor area stated for this source: 12 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.