Site start
Building extension site start — Dalkey
Dalkey, Dublin
1 commencement notice · start date 21 Oct 2015 · planning reference given
Planning D15A/0415 · Planning application
- Commencement notices
- 1
- Latest start date
- 21 Oct 2015
- Latest notice
- 1 unit
- Planning reference
- D15A/0415
- Location
- Dalkey, Dublin
Location
Where the site is
- Area
- Dalkey, Dublin
- County
- Dublin
Addresses on the notices
- lower ground floor level with new painted timber sliding sash window with profiles and sections to match existing windows
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
A. Partial lowering of basement level by 600mm. B. New insulated concrete floor to entire basement level. C. Damp-proofing of walls throughout basement level, including new wall and ceiling plasterwork. D. Removal of existing non-original internal stud walls. E. Formation of new window opening to front elevation at lower ground floor level with new painted timber sliding sash window with profiles and sections to match existing windows. F. Replacement of non-original casement window to front at lower ground floor level with hardwood sliding sash window. G. Alterations to door ope beneath front granite steps and fitting new door with granite step to same. H. Replacement of existing non-original external timber doors at lower ground floor level. I. Removal of existing timber floor to existing balcony to rear at ground floor level and installation of laminated glass floor to balcony. J. Alteration to existing internal door opes at first floor level. K. Addition of Master en-suite to front at first floor level. L. Forming new structural ope to rear roof plane and construction of new dormer window with glazed balcony. M. Addition of bathroom at second floor level. N. Installation of 4 no. heritage roof lights to front roof plane and 1 no. heritage roof light to rear roof plane. O. Replacement of gutters, downpipes and soil and waste pipes to rear. P. Conservation repair works internally to wall and ceiling plasterwork, suspended timber floors, internal joinery and fireplaces. Q. Renewal of mechanical and electrical services, including all new sanitary ware. R. New granite steps, retaining walls and planters to extended Morning Terrace to rear. S. Landscaping to front and rear. T. All associated site works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.