Site start

Altamont Street, Westport

Westport, Mayo

1 commencement notice · start date 19 Dec 2025 · no planning reference given

Commencement notices
1
Latest start date
19 Dec 2025
Latest notice
1,298 m²
Planning references
None given
Location
Altamont Street, Westport, Mayo

Location

Where the site is

Area
Westport, Mayo
County
Mayo

Addresses on the notices

  • Altamont Street, Westport, Mayo
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

Notice 1 Seven-day notice

The development will consist of the refurbishment of the existing vacant scoil Padraig building to include internal remodel, fit out, and external envelope upgrades. The existing building has been stripped back to a shell and core condition. Internal remodel works will include part demolition of internal block walls and sub-division of existing spaces using MF partitions. External envelope upgrades will upgrade the building to Part L compliance including replacement of existing ground floor concrete slab, EWIS to entire façade, new aluminium windows and doors, strip back and replace existing roof finishes with torch on weathering membrane on tapered insulation. Fit out works will include new finishes throughout, new internal joinery, and fit out of all teaching spaces to DoE requirements. Proposed site works to include complete replacement of existing underground drainage network, grubbing up and resurfacing of entire hardstand area, line marking to ball court, replacement of weathering layer to site structures roofs, minor repair and repainting or existing shelters and boundaries.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 1,298 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.