Site start

Housing site start — Newcastle

Newcastle, Dublin

14 commencement notices · latest start date 12 Jul 2021 · planning reference given

Planning SHD3ABP-305343-19 · Planning application · Council file · external

View full project timeline

Commencement notices
14
Latest start date
12 Jul 2021
Latest notice
48 units
Planning reference
305343
Location
Newcastle, Dublin

Location

Where the site is

Area
Newcastle, Dublin
County
Dublin

Addresses on the notices

  • Newcastle South and Ballynakelly, Newcastle, County Dublin
  • first floor consisting of 6no 2 storey timber frame Duplex units over 6no ground floor masonry constructed apartments
  • first floor consisting of 4no 2 storey timber frame Duplex units over 4no ground floor masonry constructed apartments
  • first floor consisting of 8no 2 storey timber frame Duplex units over 8no ground floor masonry constructed apartments
Location evidence needs care
  • Notice source points are up to 512 m apart, so no combined representative point is shown.

Source positions remain separate:

  • Public notice source · 53.295581, -6.499242 Open point
  • Public notice source · 53.296318, -6.495782 Open point
  • Public notice source · 53.295177, -6.499212 Open point
  • Public notice source · 53.294959, -6.499448 Open point
  • Public notice source · 53.296636, -6.498161 Open point
  • Public notice source · 53.294705, -6.494023 Open point
  • Public notice source · 53.296810, -6.498661 Open point
  • Public notice source · 53.295912, -6.498031 Open point
  • Public notice source · 53.294741, -6.496331 Open point
  • Public notice source · 53.297990, -6.498483 Open point
  • Public notice source · 53.298073, -6.498470 Open point
  • Public notice source · 53.298310, -6.496487 Open point
  • Public notice source · 53.298031, -6.496466 Open point
  • Public notice source · 53.298097, -6.499244 Open point

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Phase 6 - The construction of 48 two storey timber frame residential units, comprising of a mix of terraced and semi detached units, that form part of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin.

Work stated for this notice 48 units Explicit phase quantity stated by the source.

Floor area stated for this source: 5,744 m².

Planning reference 305343
Notice 2 Seven-day notice

Erection of a 5/3 storey traditional built stepped multi unit with balconies & terraces, comprising of 26 residential apartment units, 1 ground floor commercial unit and 24 Duplex/Apartment units and associated site works, surface car parking, including a new site entrance to the development. 1 Building

Work stated for this notice 50 units Explicit phase quantity stated by the source.

Floor area stated for this source: 5,146 m².

Planning reference 305343
Notice 3 Seven-day notice

Erection of one 3 storey multi unit block with terraces at first floor consisting of 6no 2 storey timber frame Duplex units over 6no ground floor masonry constructed apartments.

Work stated for this notice 12 units Explicit phase quantity stated by the source.

Floor area stated for this source: 1,261 m².

Planning reference 305343
Notice 4 Seven-day notice

Erection of one 3 storey multi unit block with terraces at first floor consisting of 4no 2 storey timber frame Duplex units over 4no ground floor masonry constructed apartments.

Work stated for this notice 8 units Explicit phase quantity stated by the source.

Floor area stated for this source: 845 m².

Planning reference 305343
Notice 5 Seven-day notice

Erection of one 3 storey multi unit block with terraces at first floor consisting of 8no 2 storey timber frame Duplex units over 8no ground floor masonry constructed apartments.

Work stated for this notice 16 units Explicit phase quantity stated by the source.

Floor area stated for this source: 1,677 m².

Planning reference 305343
Notice 6 Commencement notice (owner-supplied)

Phase 5a - The construction of 7 two storey timber frame residential units, comprising of 2 terraced units, that form part of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 817 m².

Source unit value with scope not stated: 122 units. It is not presented as notice-specific scale.

Planning reference 305343 Developer stated: Cairn Homes Construction Ltd
Notice 7 Commencement notice

Phase 5 - The construction of 31 two storey timber frame residential units, comprising of a mix of terraced and semi detached units, that form part of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin.

Work stated for this notice 31 units Explicit phase quantity stated by the source.

Floor area stated for this source: 3,660 m².

Planning reference 305343
Notice 8 Commencement notice

Phase 4 - The construction of 65 two storey timber frame residential units, comprising of a mix of terraced and semi detached units, that form part of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin.

Work stated for this notice 65 units Explicit phase quantity stated by the source.

Floor area stated for this source: 7,522 m².

Planning reference 305343
Notice 9 Seven-day notice

Sub-division of existing two storey commercial building into 3 apartments (C3) at 32 Ballynakelly Edge, Newcastle, Co. Dublin.

Work stated for this notice 3 units Explicit phase quantity stated by the source.

Floor area stated for this source: 232 m².

Planning reference 305343
Notice 10 Seven-day notice

Phase 3, involving the construction of 1 Block of 16 Duplex/Apartments of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin. The overall site comprises lands to the south of Main Street (circa 15 hectares) together with three number additional infill sites at the corner of Burgage Street and Newcastle Boulevard (circa 0.8 hectares); number 32 Ballynakelly Edge (circa 0.05 hectares); and Ballynakelly Rise (circa 0.18 hectares). The proposed development will consist of: 1. the demolition of five number structures on site, total area measuring 359 square metres, comprising two number habitable dwellings and three number associated outbuildings/sheds located to the north-west of the site; 2. development of 406 number residential homes; 3. a childcare facility (518 square metres gross floor area); 4. one number commercial unit (67.7 square metres gross floor area); 5. reservation of a school site (1.5 hectares); 6. new vehicular, cycle and pedestrian access from Main Street; 7. continuation of Newcastle Boulevard forming part of a new east-west link street; 8. a new public park (two hectares); 9. pocket parks and greenway together with associated internal access roads, pedestrian and cycle paths and linkages; 10. one number single storey marketing suite (81 square metres) and signage (including hoarding) during the construction phase of development only and, 11. all associated site and development works. at Circa 15 hectare site South of Main Street, Newcastle, Dublin

Work stated for this notice 16 units Explicit phase quantity stated by the source.

Floor area stated for this source: 1,777 m².

Planning reference 305343
Notice 11 Seven-day notice

Phase 3, involving the construction of 1 Block of 12 Duplex/Apartments of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin. The overall site comprises lands to the south of Main Street (circa 15 hectares) together with three number additional infill sites at the corner of Burgage Street and Newcastle Boulevard (circa 0.8 hectares); number 32 Ballynakelly Edge (circa 0.05 hectares); and Ballynakelly Rise (circa 0.18 hectares). The proposed development will consist of: 1. the demolition of five number structures on site, total area measuring 359 square metres, comprising two number habitable dwellings and three number associated outbuildings/sheds located to the north-west of the site; 2. development of 406 number residential homes; 3. a childcare facility (518 square metres gross floor area); 4. one number commercial unit (67.7 square metres gross floor area); 5. reservation of a school site (1.5 hectares); 6. new vehicular, cycle and pedestrian access from Main Street; 7. continuation of Newcastle Boulevard forming part of a new east-west link street; 8. a new public park (two hectares); 9. pocket parks and greenway together with associated internal access roads, pedestrian and cycle paths and linkages; 10. one number single storey marketing suite (81 square metres) and signage (including hoarding) during the construction phase of development only and, 11. all associated site and development works. at Circa 15 hectare site South of Main Street, Newcastle, Dublin

Work stated for this notice 12 units Explicit phase quantity stated by the source.

Floor area stated for this source: 1,334 m².

Planning reference 305343
Notice 12 Seven-day notice

Phase 3, involving the construction of 1 Block of 8 Duplex/Apartments of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin. The overall site comprises lands to the south of Main Street (circa 15 hectares) together with three number additional infill sites at the corner of Burgage Street and Newcastle Boulevard (circa 0.8 hectares); number 32 Ballynakelly Edge (circa 0.05 hectares); and Ballynakelly Rise (circa 0.18 hectares). The proposed development will consist of: 1. the demolition of five number structures on site, total area measuring 359 square metres, comprising two number habitable dwellings and three number associated outbuildings/sheds located to the north-west of the site; 2. development of 406 number residential homes; 3. a childcare facility (518 square metres gross floor area); 4. one number commercial unit (67.7 square metres gross floor area); 5. reservation of a school site (1.5 hectares); 6. new vehicular, cycle and pedestrian access from Main Street; 7. continuation of Newcastle Boulevard forming part of a new east-west link street; 8. a new public park (two hectares); 9. pocket parks and greenway together with associated internal access roads, pedestrian and cycle paths and linkages; 10. one number single storey marketing suite (81 square metres) and signage (including hoarding) during the construction phase of development only and, 11. all associated site and development works. at Circa 15 hectare site South of Main Street, Newcastle, Dublin

Work stated for this notice 8 units Explicit phase quantity stated by the source.

Floor area stated for this source: 884 m².

Planning reference 305343
Notice 13 Commencement notice

Phase 2, involving the construction of 53 houses of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin. The overall site comprises lands to the south of Main Street (circa 15 hectares) together with three number additional infill sites at the corner of Burgage Street and Newcastle Boulevard (circa 0.8 hectares); number 32 Ballynakelly Edge (circa 0.05 hectares); and Ballynakelly Rise (circa 0.18 hectares). The proposed development will consist of: 1. the demolition of five number structures on site, total area measuring 359 square metres, comprising two number habitable dwellings and three number associated outbuildings/sheds located to the north-west of the site; 2. development of 406 number residential homes; 3. a childcare facility (518 square metres gross floor area); 4. one number commercial unit (67.7 square metres gross floor area); 5. reservation of a school site (1.5 hectares); 6. new vehicular, cycle and pedestrian access from Main Street; 7. continuation of Newcastle Boulevard forming part of a new east-west link street; 8. a new public park (two hectares); 9. pocket parks and greenway together with associated internal access roads, pedestrian and cycle paths and linkages; 10. one number single storey marketing suite (81 square metres) and signage (including hoarding) during the construction phase of development only and, 11. all associated site and development works. at Circa 15 hectare site South of Main Street, Newcastle, Dublin

Work stated for this notice 53 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 5,982 m².

Planning reference 305343
Notice 14 Commencement notice

Phase 1, involving the construction of 51 houses of the approved strategic housing development on lands at Newcastle South and Ballynakelly, Newcastle, County Dublin. The overall site comprises lands to the south of Main Street (circa 15 hectares) together with three number additional infill sites at the corner of Burgage Street and Newcastle Boulevard (circa 0.8 hectares); number 32 Ballynakelly Edge (circa 0.05 hectares); and Ballynakelly Rise (circa 0.18 hectares). The proposed development will consist of: 1. the demolition of five number structures on site, total area measuring 359 square metres, comprising two number habitable dwellings and three number associated outbuildings/sheds located to the north-west of the site; 2. development of 406 number residential homes; 3. a childcare facility (518 square metres gross floor area); 4. one number commercial unit (67.7 square metres gross floor area); 5. reservation of a school site (1.5 hectares); 6. new vehicular, cycle and pedestrian access from Main Street; 7. continuation of Newcastle Boulevard forming part of a new east-west link street; 8. a new public park (two hectares); 9. pocket parks and greenway together with associated internal access roads, pedestrian and cycle paths and linkages; 10. one number single storey marketing suite (81 square metres) and signage (including hoarding) during the construction phase of development only and, 11. all associated site and development works.

Work stated for this notice 51 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 6,367 m².

Planning reference 305343

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.