Site start
Housing site start — Ballsbridge
Ballsbridge, Dublin
1 commencement notice · start date 17 Sep 2025 · planning reference given
Planning WEB1830/25 · Planning application
- Commencement notices
- 1
- Latest start date
- 17 Sep 2025
- Latest notice
- 469 m²
- Planning reference
- WEB1830/25
- Location
- Ballsbridge, Dublin
Location
Where the site is
- Area
- Ballsbridge, Dublin
- County
- Dublin
Addresses on the notices
- lower ground floor level
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Change of use of the building from office use to a single residential house (as previously granted under Reg. Ref: 4008/24); Construction of a replacement single-storey flat roof side extension, with sedum roof and associated roof lights, at lower ground floor level; Construction of a new single-storey flat roof extension to the rear at lower ground floor level, with associated roof terrace accessed at upper ground floor level; Cleaning of the existing granite and brick facades and granite entrance steps; repointing of existing front and part side elevations and entrance steps in lime mortar; The replacement of the non-original uPVC windows, on the rear elevation only , with timber sliding sash windows, together with amendments of two select opes (conversion from window to door openings); The replacement of the existing non-original lower ground floor slab with a new insulated concrete slab; Internal reconfiguration, refurbishment and associated conservation and restoration works throughout; New mechanical and electrical services throughout; New pedestrian gate to side lane; Widening of the existing vehicular entrance together with associated modifications to the existing vehicular entrance gates and railings to the front boundary, and provision of new railing to the east boundary of the front garden; All ancillary site, boundary and landscaping works.
Floor area stated for this source: 469 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.