Protected structure · Co. Dublin

27 Clyde Road, Ballsbridge, Dublin 4, D04 F838

Granted 11 Jul 2025 (final grant issued 18 Aug 2025)

We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 4 by email

Key facts

  • Planning application WEB1830/25 at 27 Clyde Road, Ballsbridge, Dublin 4, D04 F838: Change of use of the building from office use to a single residential…
  • It was received by Dublin City Council on 14 Apr 2025.
  • Status: Granted 11 Jul 2025 (final grant issued 18 Aug 2025).
  • Work was due to start on 17 Sep 2025, according to the commencement notice. It does not say which contractors or suppliers are appointed.

Source: the Dublin City Council planning register, as last seen on 13 Oct 2026. Search the council's register

More planning applications in Dublin 4 · Planning applications in Co. Dublin

Council register

The council's register shows: Granted on 11 Jul 2025.

Application details as we last saw them in the national register on 13 Oct 2026.

What and where

Change of use of the building from office use to a single residential…

PROTECTED STRUCTURE: The development will consist of: A). Change of use of the building from office use to a single residential house (as previously granted under Reg. Ref: 4008/24); B). Construction of a replacement single-storey flat roof side extension, with sedum roof and associated roof lights, at lower ground floor level; C). Construction of a new single-storey flat roof extension to the rear at lower ground floor level, with associated roof terrace accessed at upper ground floor level; D). Cleaning of the existing granite and brick facades and granite entrance steps; repointing of existing front and part side elevations and entrance steps in lime mortar; E). The replacement of the non-original uPVC windows, on the rear elevation only, with timber sliding sash windows, together with amendments of two select opes (conversion from window to door openings); F). The replacement of the existing non-original lower ground floor slab with a new insulated concrete slab; G). Internal reconfiguration, refurbishment and associated conservation and restoration works throughout; H). New mechanical and electrical services throughout; I) New pedestrian gate to side lane; J) Widening of the existing vehicular entrance together with associated modifications to the existing vehicular entrance gates and railings to the front boundary, and provision of new railing to the east boundary of the front garden; L). All ancillary site, boundary and landscaping works.

Location
Dublin 4, Co. Dublin Map
Planning reference
WEB1830/25

Numbers and dates

Project type
Protected structure
Received
14 Apr 2025
Decision to grant
11 Jul 2025
Final grant
18 Aug 2025
Site start notified
17 Sep 2025
Protected structure
Yes

Timeline

  1. Application received
  2. Decision to grant
  3. Final grant issued
  4. Site start notified

Site history

This site's history

  1. Earlier permission 4008/24 for this site: granted 4 Sep 2024.

    PROTECTED STRUCTURE: Change of use for a 3-storey semi-detached period building (protected structure Ref.no. 1979) from office use to a… Named in this application's description

Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.

Outlook

What happens next

Work was due to start on 17 Sep 2025, according to the commencement notice. It does not say which contractors or suppliers are appointed. View the site start

Work packages named so far

  • Conservation work to a protected structureNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning registerSearch planning.agileapplications.ie for reference WEB1830/25.Search the register

How we know this

From the Dublin City Council planning register, as last seen on 13 Oct 2026. The council's own file is the official record.

Site starts

Commencement notices for this permission

  1. 17 Sep 2025Notice filed · Change of use of the building from office use to a single residential house...View the site start

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Dublin 4

Get alerts for Dublin 4Free. We email you when new applications appear.

Free email alerts

Get new Dublin 4 projects by email

New applications, decisions and site starts in Dublin 4, Co. Dublin. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

More alert options