Site start
Housing site start — Dublin Airport Logistics Park
Dublin Airport Logistics Park, Dublin
4 commencement notices · latest start date 28 May 2025 · planning reference given
Planning FW24A/0373E · Planning application
- Commencement notices
- 4
- Latest start date
- 28 May 2025
- Latest notice
- 25 m²
- Planning reference
- FW24A/0373E
- Location
- Dublin Airport Logistics Park, Dublin
Location
Where the site is
- Area
- Dublin Airport Logistics Park, Dublin
- County
- Dublin
Addresses on the notices
- Drake House, Dublin Airport Logistics Park, Co
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Proposed construction of a Transformer Room located on the storage/industrial site at Drake House, Dublin Airport Logistics Park, Co. Dublin 24
Floor area stated for this source: 25 m².
The proposed construction of storage/industrial unit at Drake House, Dublin Airport Logistics Park, Co. Dublin. The proposed Unit will consist of c24,450m2 storage/industrial accommodation. Ancillary to the storage/industrial area is an office space over lower ground, ground and first floor with plant space at roof over the office as shown on the accompanying drawings. The office spaces at lower ground floor, ground and first floors will be shell and core and subject to a future tenant fit out. It is noted that as part of the shell and core works the lower ground floor will be provided with a reception area, tea station, sanitary facilities and security room. The ground floor level which is located at the same level as the warehouse floor consist of the open plan shell and core office space and sanitary facilities. The first floor level consists of the shell and core office space, tea station and sanitary facilities. It is noted that the ground and first floor levels will be provided with 2 no. escape routes via the 2 no. protected stairs whereby it is noted that the Northern stair also extends up to serve the roof top plant. In addition, it is noted that there is ancillary accommodation along the South elevation consisting of an another office space over ground floor, first floor and second floor level and with plant located over the office space access via an access hatch. The space consists of open plan offices at each level and ancillary sanitary and storage spaces and is served via 1 no. stair core as shown on the accompanying drawings. It is noted that there will separate FSC application for the ancillary buildings located on the site for the ESB substation and other ancillary plant rooms as required.
Floor area stated for this source: 26,703 m².
Proposed construction of a pump house located on the storage/industrial unit site at Drake House, Dublin Airport Logistics Park, Co. Dublin 24
Floor area stated for this source: 50 m².
Proposed construction of an ESB substation and switch room located at Drake House, Dublin Airport Logistics Park, Co. Dublin 24
Floor area stated for this source: 24 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.