Gaelscoil Mhicil Ui Choileåin school — site start

Clonakilty, Cork

1 commencement notice · start date 26 Sep 2019 · planning reference given

Planning Part 8 - BR710257

Commencement notices
1
Latest start date
26 Sep 2019
Latest notice
57 houses
Planning reference
PART8-BR710257
Location
Clonakilty, Cork

Location

Where the site is

Area
Clonakilty, Cork
County
Cork
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

The development will consist of the construction of 51 no. houses and the conversion of Lower Tawnies Cottage and outhouses, which are protected structures, into 6 No. houses. The new houses comprise of 1 No. 4 Bed, 28 No. 3 Bed, and 22 no. 2 Bed dwellings. The works to the protected structures will comprise of the conversion of the derelict Lower Tawnies Cottage into a 3 Bed and a 2 Bed houses, and the outhouses into 4 no. 1 Bed houses and stores. The site works include a receptor cell to entomb and manage soil contaminated by Japanese Knotweed, foul and surface water drainage, a storm water attenuation chamber, upgrade of an existing pumping station, removal and replacement of existing fill, road realignment and safety works adjacent to the Gaelscoil Mhicil Ui Choileåin school, new site boundary treatments, landscaping and associated ancillary site development works.

Work stated for this notice 57 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 5,279 m².

Planning reference PART8-BR710257

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.