Commencement notice group

Gaelscoil Mhicil Ui Choileåin school — commencement notices

Clonakilty, Cork

1 unique commencement event · latest notified commencement 26 Sep 2019 · planning basis not stated

Unique commencement events
1
Latest notified commencement
26 Sep 2019
Latest notice
57 houses
Planning references supplied
None stated
Public location
Clonakilty, Cork

Commencement and completion records

Planning, start and completion evidence

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Exact planning records
Official record actions
0
Explicit planning relationships
Duplicate source rows consolidated
Exact completion events

Planning-anchored public geography

Site identity and location

Canonical public locality
Clonakilty, Cork
County
Cork
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

Notice 1 Commencement notice

The development will consist of the construction of 51 no. houses and the conversion of Lower Tawnies Cottage and outhouses, which are protected structures, into 6 No. houses. The new houses comprise of 1 No. 4 Bed, 28 No. 3 Bed, and 22 no. 2 Bed dwellings. The works to the protected structures will comprise of the conversion of the derelict Lower Tawnies Cottage into a 3 Bed and a 2 Bed houses, and the outhouses into 4 no. 1 Bed houses and stores. The site works include a receptor cell to entomb and manage soil contaminated by Japanese Knotweed, foul and surface water drainage, a storm water attenuation chamber, upgrade of an existing pumping station, removal and replacement of existing fill, road realignment and safety works adjacent to the Gaelscoil Mhicil Ui Choileåin school, new site boundary treatments, landscaping and associated ancillary site development works.

Work stated for this notice 57 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 5,279 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.