Site start
Housing site start — Ahascragh
Ahascragh, Galway
1 commencement notice · start date 24 Mar 2025 · planning reference given
Planning 2460805 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 24 Mar 2025
- Latest notice
- 1,212 m²
- Planning reference
- 2460805
- Location
- Ahascragh, Galway
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 2460805 Galway County Council · checked 2026-07-29T15:41:08+00:00
Planning 2460805 — CONDITIONAL · Decision 2024-12-10 · Final grant 2025-01-22
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Ahascragh, Galway
- County
- Galway
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Galway County Council planning record Application details, status and decision record for 2460805. Official council planning portal Official link · last checked 29 Jul 2026 Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
New residential housing development which includes: 1. The demolition of 2 no. existing sub- standard houses along Main Street. 2. Permission for the construction of 11 new dwelling house residential development comprising of; a. 1 no. 1 storey detached 4-bedroom unit. b. 2 no. 2 storey semi- detached 2-bedroom units. c. 2 no. 2 storey, 2-bedroom terraced units. d. 6 no. 2 storey, 3-bedroom terraced units. e. All ancillary site works, services, utilities, water connection, roads, footpaths, parking, shared surfaces, street lighting, hard and soft landscaping, to service the development. f. The provision of landscaped open spaces to include a play area. g. The connection of the development to the public sewer and for all ancillary services/plant associated with same. h. Proposed access to the residential development. Gross floor space of proposed works: 1,109.55 sqm. Gross floor space of any demolition: 102.48 sqm
Floor area stated for this source: 1,212 m².
Source unit value with scope not stated: 11 houses. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.