Commencement notice group
Commercial commencement notices — Dublin
Dublin 7, Dublin
2 unique commencement events · latest notified commencement 20 Oct 2025 · planning reference supplied
- Unique commencement events
- 2
- Latest notified commencement
- 20 Oct 2025
- Latest notice
- 7,216 m²
- Planning references supplied
- ABP-312102-21
- Public location
- Dublin 7, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Dublin 7, Dublin
- County
- Dublin
Notice location variants
- Prussia Street, Dublin 7 SN0013225DC
- Dublin, Dublin CN0119709DC
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-312102-21. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of New Student Accommodation Building at Prussia Street, Dublin 7. The construction of a student accommodation building consisting of three blocks, known as Block A, Block B & Block C, of varying heights from four to seven storeys (including ground floor), and associated site works. The building also features a lower ground floor and a localised basement level. Block A extends from the Lower Ground Floor to the 4th Floor. Block B extends from the Lower Ground Floor to the 5th Floor. Block C extends from the Lower Ground Floor to the 6th Floor. Block C also provides access to the localised basement area, which accommodates plant rooms. The Lower Ground Floor of Blocks A & B is connected, providing a communal space for students. For this submission, the space is a shell-and-core standard. It will be subject to a future Fit-Out Fire Safety Certificate Application, Commencement Notification, and BCAR Process.
Floor area stated for this source: 7,216 m².
Demolition of existing warehouse buildings together with all associated site set up works. Note, no new development works are proposed during these works. Note, a separate commencement notice will be issued for construction of the new buildings.
Floor area stated for this source: 1,605 m².