Site start
Housing site start — Dublin
Dublin 6, Dublin
1 commencement notice · start date 07 Apr 2021 · planning reference given
Planning 2906/20 · Planning application
- Commencement notices
- 1
- Latest start date
- 07 Apr 2021
- Latest notice
- 76 m²
- Planning reference
- 2906/20
- Location
- Dublin 6, Dublin
Location
Where the site is
- Area
- Dublin 6, Dublin
- County
- Dublin
Addresses on the notices
- basement level, garage at ground floor level and an artist’s studio at the upper level
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
1. Demolition of existing screen wall and gate to the rear garden of the existing property, 2. Construction of a detached Garden Building of two stories over small basement, the upper storey being in the roofspace, to the end of the rear garden to accommodate a wine store at basement level, garage at ground floor level and an artist’s studio at the upper level. The new structure will have a barrel vaulted roof with a dormer window facing north into the rear garden of the existing house, 3. New hard and soft landscaping on the garden side of the proposed structure, 4. The development will include all associated drainage and site development works.
Floor area stated for this source: 76 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.