Commencement notice group

Housing commencement notices — Dublin

Dublin 6W, Dublin

1 unique commencement event · latest notified commencement 09 Jun 2026 · planning basis not stated

Unique commencement events
1
Latest notified commencement
09 Jun 2026
Latest notice
150 m²
Planning references supplied
None stated
Public location
Dublin 6W, Dublin

Commencement and completion records

Planning, start and completion evidence

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Exact planning records
Official record actions
0
Explicit planning relationships
Duplicate source rows consolidated
Exact completion events

Planning-anchored public geography

Site identity and location

Canonical public locality
Dublin 6W, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

CN0143194DC BCMS open-data feed

Refurbishment and upgrading works to existing two-storey semi-detached dwelling including selective internal demolition and reconfiguration works; removal of non-original internal walls and chimney breasts; refurbishment and repair of existing roof structure including replacement breathable membrane, breathable underlay, repair of flashings, gutters and downpipes, reuse of existing natural slates where feasible, and attic insulation upgrades. Works also include refurbishment and repair of existing external brickwork and boundary walls; replacement of existing windows; minor alterations to front garden layout including provision of covered bicycle storage; internal reconfiguration of ground and first floor layouts; provision of WC beneath staircase; enclosure and conversion of existing covered side passage to internal ancillary accommodation with rooflight above, incorporating utility area, cloakroom and bicycle storage; attic access improvements including new attic stairs and installation of 1 no. rear rooflight. Energy upgrade works to include improvements to air-tightness and thermal performance, including application of Diasen Diathonite Thermactive insulating plaster system and associated insulation works throughout.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 150 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.