Commencement notice group
Housing commencement notices — Dublin
Dublin 6W, Dublin
1 separate notice · latest notified commencement 09 Jun 2026 · planning basis not stated
- Source notices
- 1
- Latest notified commencement
- 09 Jun 2026
- Latest notice
- 150 m²
- Planning references supplied
- None stated
- Public location
- Dublin 6W, Dublin
Public source geography
Site location
- Public site / locality
- Dublin 6W, Dublin
- County
- Dublin
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Refurbishment and upgrading works to existing two-storey semi-detached dwelling including selective internal demolition and reconfiguration works; removal of non-original internal walls and chimney breasts; refurbishment and repair of existing roof structure including replacement breathable membrane, breathable underlay, repair of flashings, gutters and downpipes, reuse of existing natural slates where feasible, and attic insulation upgrades. Works also include refurbishment and repair of existing external brickwork and boundary walls; replacement of existing windows; minor alterations to front garden layout including provision of covered bicycle storage; internal reconfiguration of ground and first floor layouts; provision of WC beneath staircase; enclosure and conversion of existing covered side passage to internal ancillary accommodation with rooflight above, incorporating utility area, cloakroom and bicycle storage; attic access improvements including new attic stairs and installation of 1 no. rear rooflight. Energy upgrade works to include improvements to air-tightness and thermal performance, including application of Diasen Diathonite Thermactive insulating plaster system and associated insulation works throughout.
150 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.