Site start
Building extension site start — Dalkey
Dalkey, Dublin
1 commencement notice · start date 06 Jul 2020 · planning reference given
Planning D19A/0101 · Planning application
- Commencement notices
- 1
- Latest start date
- 06 Jul 2020
- Latest notice
- 1 unit
- Planning reference
- D19A/0101
- Location
- Dalkey, Dublin
Location
Where the site is
- Area
- Dalkey, Dublin
- County
- Dublin
Addresses on the notices
- lower ground floor, external stairs at lower ground floor level front façade and coal bunker roof front façade
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
1. Demolition of existing utility roof at lower ground floor, external stairs at lower ground floor level front façade and coal bunker roof front façade. 2. Part demolition of kitchen wall ground floor, kitchen wall lower ground floor, family room wall, windows to front façade lower ground floor and lower ground floor utility wall. 3. Extension lower ground floor rear 2.25 sqm and ground floor level rear 3.3 sqm. 4. Re-construction of existing stairs rear garden level, mono-pitched roof and rear garden terrace 7.5 sqm. 5. New external wall north elevation rear garden, window ground floor level rear façade, garden level external storage 20.8 sqm, side entrance ground floor, railings, granite steps to side entrance and 4 roof lights to central valley of existing roof. 6. Internal alterations and refurbishment and site works including proposed new connection for foul drainage to existing public mains.
Floor area stated for this source: 220 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.