Site start

Building extension site start — Dalkey

Dalkey, Dublin

1 commencement notice · start date 06 Jul 2020 · planning reference given

Planning D19A/0101 · Planning application

View full project timeline

Commencement notices
1
Latest start date
06 Jul 2020
Latest notice
1 unit
Planning reference
D19A/0101
Location
Dalkey, Dublin

Location

Where the site is

Area
Dalkey, Dublin
County
Dublin

Addresses on the notices

  • lower ground floor, external stairs at lower ground floor level front façade and coal bunker roof front façade
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

1. Demolition of existing utility roof at lower ground floor, external stairs at lower ground floor level front façade and coal bunker roof front façade. 2. Part demolition of kitchen wall ground floor, kitchen wall lower ground floor, family room wall, windows to front façade lower ground floor and lower ground floor utility wall. 3. Extension lower ground floor rear 2.25 sqm and ground floor level rear 3.3 sqm. 4. Re-construction of existing stairs rear garden level, mono-pitched roof and rear garden terrace 7.5 sqm. 5. New external wall north elevation rear garden, window ground floor level rear façade, garden level external storage 20.8 sqm, side entrance ground floor, railings, granite steps to side entrance and 4 roof lights to central valley of existing roof. 6. Internal alterations and refurbishment and site works including proposed new connection for foul drainage to existing public mains.

Work stated for this notice 1 unit Explicit phase quantity stated by the source.

Floor area stated for this source: 220 m².

Planning reference D19A/0101

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.