Commencement notice group

Housing commencement notices — Portroe

Portroe, Tipperary

2 unique commencement events · latest notified commencement 20 Oct 2025 · planning reference supplied

View full project timeline

Unique commencement events
2
Latest notified commencement
20 Oct 2025
Latest notice
80 m²
Planning references supplied
24/197
Public location
Portroe, Tipperary

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
1
Exact completion events
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Portroe, Tipperary
County
Tipperary
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Tipperary County Council planning record Application details, status and decision record for 24/197. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

New timber clad storage shed of (80 sq.m) adjacent to existing vehicular entrance.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 80 m².

Planning reference 24/197
Notice 2 Commencement notice

1.) existing main house (371 sq.m) reconfiguration of rooms on all three levels including moving kitchen to entrance level, new bathrooms on basement and entrance levels, existing 1990's extension to have a new window, new rooflight and enlarged gable window with new access to a new terrace (10 sq.m) 2.) New waste treatment system and associated percolation area - protected structures TRPS 610 and TRPS 611.

Work stated for this notice 1 house Explicit phase quantity stated by the source.

Floor area stated for this source: 371 m².

Planning reference 24/197

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.