Back to leads
Est. value
Not listed
Units
1
Floor area
86 m²
Commenced
14 Jul 2025
Going to siteCurrent commencement
extension and renovation of existing dwelling, demolition of rear porch, installation of waste water treatment system and percolation area and de-commission of existing septic tank, to demolish two sheds and remove concrete slab on site
Tipperary / Golden / Golden, Tipperary
Key facts
Lead summary
- Commenced date
- 14 Jul 2025
- Planning permission
- 2560023
- Local authority
- Tipperary County Council
- Source reference
- CN0130878TT
- Units
- 1
- Floor area
- 86 m²
- Lead lane
- Current owner-export commencement
- Outreach timing note
- Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.
Official description
Verbatim source text
extension and renovation of existing dwelling, demolition of rear porch, installation of waste water treatment system and percolation area and de-commission of existing septic tank, to demolish two sheds and remove concrete slab on site
Verify against official sourceLikely trades & supplier leads