Back to leads
Going to siteCurrent commencement

extension and renovation of existing dwelling, demolition of rear porch, installation of waste water treatment system and percolation area and de-commission of existing septic tank, to demolish two sheds and remove concrete slab on site

Tipperary / Golden / Golden, Tipperary

Create alert Official file
Est. value Not listed
Units 1
Floor area 86 m²
Commenced 14 Jul 2025

Key facts

Lead summary

Commenced date
14 Jul 2025
Planning permission
2560023
Local authority
Tipperary County Council
Source reference
CN0130878TT
Units
1
Floor area
86 m²
Lead lane
Current owner-export commencement
Outreach timing note
Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.

Official description

Verbatim source text

extension and renovation of existing dwelling, demolition of rear porch, installation of waste water treatment system and percolation area and de-commission of existing septic tank, to demolish two sheds and remove concrete slab on site

Verify against official source

Likely trades & supplier leads

Inferred from scheme type and scale

Review source file
Create alert