Back to leads
Going to siteCurrent commencement

The development will consist of

Dublin / Castleknock / Castleknock, Dublin

Create alert Official file
Est. value Not listed
Units Not listed
Floor area 404 m²
Commenced 24 Jul 2025

Key facts

Lead summary

Commenced date
24 Jul 2025
Builder / developer
B&g Construction Ltd
Planning permission
FW25A/0073E
Local authority
Fingal County Council
Floor area
404 m²
Outreach timing note
Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.

Official description

Verbatim source text

The development will consist of: 1) Demolition of the existing single- storey garage, outbuilding, utility room and living room. 2) The construction of single and two- storey extensions to the rear (west) & sides (north & south) of the dwelling including a first floor balcony to the side (south). 3) The construction of a replacement hipped roof & associated rooflight. 4) The construction of a new entrance porch & portico. 5) Changes to the fenestration on the front & rear elevations to include new & revised window openings. 6) Covered terrace / canopy areas to the rear & side (south) elevations. 7) The construction of a garden room comprising home gym and garden storage with associated canopy feature. 8) The widening of the existing vehicular entrance & new boundary walls, pillars and railings. 9) All associated works, landscaping & ancillary site- works required to carry out the development

Verify against official source

Likely trades & supplier leads

Inferred from scheme type and scale

Review source file
Create alert