Back to leads
Going to siteCurrent commencement

Construction of a minor extension'link'room approx 1.9sqm between existing boiler room and current extension to the rear of house. Replacement of existing roof on current single story extension (23sqm) from pitched roof to flat roof. Internal Renovation of current house

Louth / Drogheda / Drogheda, Louth

Create alert Official file
Est. value Not listed
Units 1
Floor area 25 m²
Commenced 11 Sep 2025

Key facts

Lead summary

Commenced date
11 Sep 2025
Planning permission
2560149
Local authority
Louth County Council
Source reference
CN0133389LH
Units
1
Floor area
25 m²
Lead lane
Current owner-export commencement
Outreach timing note
Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.

Official description

Verbatim source text

Construction of a minor extension'link'room approx 1.9 m² between existing boiler room and current extension to the rear of house. Replacement of existing roof on current single story extension (23 m²) from pitched roof to flat roof. Internal Renovation of current house

Verify against official source

Likely trades & supplier leads

Inferred from scheme type and scale

Review source file
Create alert