Tullow, Carlow
Site start 25 Jun 2024
Archived record
This application has left our current planning lists, so this page is no longer updated. We last saw it in the council's register on 9 Jun 2026. The details below are as they were then. The council's register has the current status.
Search the Carlow planning registerCurrent planning applications in Tullow
What and where
21 homes
the construction of 21 number two storey dwellings, comprising of 8 number semi-detached dwellings, 4 blocks of 3 number terraced dwellings and one detached dwelling, alterations to existing splayed entrance, the connection to local watermain, public sewer, and all associated site development works, including the demolition of existing out buildings.
- Location
- Tullow, Co. Carlow Map
- Council
- Carlow County Council
- Planning reference
- 2360164
- Applicant
- Johnstown Home Developments Ltd
- Agent
- Johnstown Home Developments Ltd
Key facts
- Homes
- 21
- Floor area
- 2,119 m²per planning documents
- Project type
- Large residential
- Site start
- 25 Jun 2024
Documents and evidence
Check the record
- Council planning fileThe application file 2360164 on eplanning.ie: drawings, reports and the decision.Open the council's file
- From the planning documentsRead from Application Form - Part A in the council's file.
- Unit mix
- 21 3 Bed
- Floor area
- 2,119 m² (per planning documents)
- Site area
- 0.8 ha
- Applicant
- Johnstown Home Developments Ltd.
- Scope
- Construction of 21 two-storey dwellings, alterations to entrance, connection to watermain and public sewer, demolition of outbuildings.
- Roofing
- “Black concrete roof tiles/slates”
- Windows/doors
- “uPVC frames double glazed windows, hardwood timber front door”
- Rainwater
- “aluminum/PVC rainwater goods, Cast Iron/upvc gutters”
- Heat pump
- “Air to Water Heat Pump & Underfloor Heating”
How we know this
From the Carlow County Council planning register, as last seen on 9 Jun 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.
Site starts
Site starts and completion
- 25 Jun 2024Work started · Construction of 21no. dwellings, connection to services and all associated works
- Completion certificate recordedRecorded in Jun 2024 · 8 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Sep 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.