Site start · Co. Carlow
Fenagh, Carlow
Site start 2 Apr 2025
Archived record
This application has left our current planning lists, so this page is no longer updated. We last saw it in the council's register on 12 Jul 2026. The details below are as they were then. The council's register has the current status.
Search the Carlow planning registerCurrent planning applications in Fenagh
What and where
2 homes
to retain groundworks and concrete base as constructed with full planning permission to construct a domestic shed on same. Planning permission is sought for revisions to previous grant of planning Ref 20350. The revisions include a redesign of the proposed extension. Planning permission for part demolition of the existing dwelling, part demolition of the existing outbuildings, alterations and renovations to existing dwelling, new front boundary wall treatment, modifications to existing entrance and all associated site works
- Location
- Fenagh, Co. Carlow Map
- Council
- Carlow County Council
- Planning reference
- 2460089
Key facts
- Homes
- 2
- Floor area
- 213 m²per planning documents
- Indicative value
- €500k–1mPlanningBrief estimate
- Project type
- Small residential
- Site start
- 2 Apr 2025
Documents and evidence
Check the record
- Council planning fileThe application file 2460089 on eplanning.ie: drawings, reports and the decision.Open the council's file
- From the planning documentsRead from Application Form - Part A in the council's file.
- Floor area
- 213 m² (per planning documents)
- Site area
- 0.39 ha
- Scope
- Retention of groundworks and concrete base, and full permission for a domestic shed, part demolition, alterations, renovations, new boundary wall, and entrance modifications.
- Groundworks
- “Retention permission to retain groundworks and concrete base”
How we know this
From the Carlow County Council planning register, as last seen on 12 Jul 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.
Site starts
Commencement notices for this permission
- 2 Apr 2025Work started · phase 1 · Permission to construct a new Extension, alterations and renovations to existing...
- 3 Apr 2025Work started · phase 2 · Proposed Domestic Shed
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.